Project: Q+2   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Michael Dunning   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:72.1
Total Flight Time:
Total Expense:$10272.78
Start/Last Date:Feb 21, 2015 - No Finish Date
Engine:Revmaster R2100-D S/N A-2605
Propeller:Cowley 56x45
Panel:Westach
 
Friendly URL: https://eaabuilderslog.org?s=Q+2

Home or Last Project Picture

Oct 01, 2022     HVX MODS: Pulling the Plug - (0.5 hour)       Category: Engine
I previously broke a 1/4 inch (6mm) hex bit trying to remove the oil cooler block off plugs. This time I heated up the area with a heat gun before attempting removal. I used the highest heat setting for 60 seconds, knowing that red loctite releases at ~500*F and magnesium self-ignites at ~850*F. After heating the area and waiting, the plugs turned right out.

Despite ZERO references in the maintenance manual, it appears my engine was assembled using red loctite throughout.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.